☰ MENU
Repair Electrical Distribution System
Port Hueneme, California. 2014. This project upgraded and replaced 50% of the electrical distribution system at CBC Port Hueneme that had exceeded its useful life and was susceptible to failure. UG 12kV Electrical Distribution Systems…
Port Hueneme, California. 2014.
This project upgraded and replaced 50% of the electrical distribution system at CBC Port Hueneme that had exceeded its useful life and was susceptible to failure. UG 12kV Electrical Distribution Systems Experience, Design Bid Build.
Project Value: $2.9 million.
- Date: January 2015
- Category: Project Profiles